Most paver failures are base failures. StoneCraft builds every driveway, patio, and pool deck to a written specification — compaction tested, laser graded, and documented — so the surface you get in year fifteen is the one you paid for in year one.
1.9M
SQ FT INSTALLED
±3/8"
SURFACE TOLERANCE
98%
BASE COMPACTION
NOTE: SECTION SHOWN IS OUR VEHICULAR STANDARD. PEDESTRIAN APPLICATIONS USE A REDUCED BASE DEPTH PER SITE SOIL REPORT. NO EXCEPTIONS ARE MADE TO L-03 COMPACTION.
TABLE 02 — INSTALLATION STANDARDS
| PARAMETER | STONECRAFT STANDARD | REFERENCE |
|---|---|---|
| Base compaction | 98% standard Proctor, tested per lift | ASTM D698 |
| Surface tolerance | ±3/8" over a 10-foot straightedge | ICPI TM-4 |
| Drainage slope | 2.0% minimum, laser-verified | SPEC 220.4 |
| Edge restraint | Concrete or spiked PVC, continuous | SPEC 310.1 |
| Joint sand | Polymeric, swept & activated twice | SPEC 415.2 |
| Frost protection | Base depth below local frost heave line | SPEC 118.7 |
Every project closes with a signed inspection sheet recording compaction readings, slope measurements, and joint-sand activation — filed with your warranty. If a future contractor ever needs to know exactly what's under your patio, you'll be the rare homeowner who can hand them the drawing.
FIG 3.0 — TYPICAL PATIO BUILD, 600 SQ FT
Site protection, utility locates, excavation to spec depth
Subgrade proof-roll, geotextile, first aggregate lift + compaction
Final lifts, laser grading to 2.0% slope, base compaction test
Screed bedding sand, lay field pattern, cut borders
Edge restraint, polymeric sand, plate compaction, activation
Detail pass, site restoration, documented final inspection
FIELD REPORT — CLIENT, 7 YEARS POST-INSTALL
"Two neighbors installed patios the same summer we did. Both have settled and repoured sections. Ours still drains at the slope on the drawing — I checked it with a level, because StoneCraft turned me into that kind of person."
— R. VASQUEZ · LOT 14, KETTLE CREEK · INSTALL NO. 1,108 (2019)
FORM 04 — INTAKE
A senior estimator visits your site, evaluates soils and drainage, and issues a written scope with a fixed price. The assessment is free; the drawing is yours to keep.